Progress this Weekend...
  • painted base coats on baseboards
  • installed baseboards
  • caulked on the bottom and top of the baseboards
  • finished painting the walls
  • installed the light fixture
  • caulked around the bottom of the tub
  • caulked between the tile and the sheetrock
  • caulked around the mirror
  • finished a little tiling around the tub
Our to do list in order to have a COMPLETE bathroom:

  • caulk the nail holes and touch up the paint on baseboards
  • touch up paint on walls and ceiling